Tamiami Trail

Smart Structures furnished, Installed, Monitoring System, and certified, the Instrumentation for two Bridges on SR-90 (Tamiami Trail) from East of Osceola Camp to West or the Airboat Association of Florida, Miami, Florida. Smart Structures installed on Bridge 1 with a length of 1.43 miles, and Bridge 2, with a length of 0.88 miles, 1102 Sensors including Dynamic Strain Gauges, Static Strain Gauges, Accelerometers, Temperature Sensors, and Corrosion Sensors.
In addition, data could be collected wirelessly from this smart transportation project structure well after the construction crews have left the site. Any engineer from anywhere in the world could check into Tamiami Trail and see the amazing sustainability benefits, which continues to be a marvel of modern engineering. The ongoing Structural Health Monitoring (SHM) across the entire Life Cycle of the infrastructure asset makes it more sustainable and resilient than ever.

Project Title

Client European Co
Date June 2020
Category Construction

Follow Us

BE SURE TO GET THE LASTEST EXCLUSIVES OFFERS, PRODUCT RELEASES AND SO MUCH MORE

Sign up and subscribe to our newsletter and get inspired every month